75 /100 · forming
Phoenix Metro is forming and accelerating: the drivers over the last 90 days are data center construction (14), grid expansion (4), announced investment (1). Interconnection queue of 9,900 MW.
| Interconnection queue | 9.900 MW |
| Active requests | 15 |
| Trend | ▲ accelerating |
| Signals (30d) | 11 |
| Known data centers | 80 |
CFI = formation 0.865 · energy 0.816 · momentum 1.0 · corroboration 0.0. Today's signal, open methodology — no promise of a future hit.
Why (reproducible): 0.5·credibilidade(0.0) + 0.5·materialização(88) = 44.0 → 44.0
Confidence média (±13) — signal coverage + corroboration. Descriptive — it measures TODAY's reality, not a promise of a future hit. Public criteria at /methodology · how we computed THIS ↗; sources tagged (official vs. news).
🔒 This call is sealed in the ledger (#806d8e96b7d3) — recompute it ↗: we recompute the sha256 of the frozen fields and show you it matches.
Full intelligence for Phoenix Metro (real vs. speculative queue, player intent, alerts) — talk to us.