77 /100 · forming
New York / New Jersey Metro is forming and accelerating: the drivers over the last 90 days are grid_demand_telemetry (204), announced investment (3), data center construction (3). Interconnection queue of 6,376 MW. Active players: Data Centre Coalition, Data Center Watch, Google.
| Interconnection queue | 6.376 MW |
| Active requests | 15 |
| Trend | ▲ accelerating |
| Signals (30d) | 7 |
| Known data centers | 90 |
CFI = formation 0.941 · energy 0.794 · momentum 1.0 · corroboration 0.0. Today's signal, open methodology — no promise of a future hit.
Why (reproducible): 0.5·credibilidade(19.0) + 0.5·materialização(88) = 53.5 → 53.5
Confidence média (±13) — signal coverage + corroboration. Descriptive — it measures TODAY's reality, not a promise of a future hit. Public criteria at /methodology · how we computed THIS ↗; sources tagged (official vs. news).
🔒 This call is sealed in the ledger (#8db969a2eb56) — recompute it ↗: we recompute the sha256 of the frozen fields and show you it matches.
Full intelligence for New York / New Jersey Metro (real vs. speculative queue, player intent, alerts) — talk to us.