58 /100 · heating
Tennessee is forming and accelerating: the drivers over the last 90 days are grid_demand_telemetry (214), data center construction (6), grid expansion (4). Interconnection queue of 100 MW. Active players: Trump administration, Tesla, SpaceX.
| Interconnection queue | 100 MW |
| Active requests | 1 |
| Trend | ▲ accelerating |
| Signals (30d) | 10 |
| Known data centers | 0 |
CFI = formation 0.77 · energy 0.363 · momentum 1.0 · corroboration 0.0. Today's signal, open methodology — no promise of a future hit.
Why (reproducible): 0.5·credibilidade(22.0) + 0.5·materialização(88) = 55.0 → 55.0
Confidence média (±12) — signal coverage + corroboration. Descriptive — it measures TODAY's reality, not a promise of a future hit. Public criteria at /methodology · how we computed THIS ↗; sources tagged (official vs. news).
🔒 This call is sealed in the ledger (#aeb539169f82) — recompute it ↗: we recompute the sha256 of the frozen fields and show you it matches.
Full intelligence for Tennessee (real vs. speculative queue, player intent, alerts) — talk to us.