LOADSTAR · How we compute it

How we computed the verdict for Atlanta Metro

Georgia, US · descriptive, reproducible — no promise of a future hit

Reality Index: 49.0 ±12 · 🟡 MIXED

The formula (reproducible): 0.5·credibilidade(10.0) + 0.5·materialização(88) = 49.0 → 49.0

Industry checklist (our proxy for SemiAnalysis): 2/3 gates (land + power + permit), inferred from our detected signals — not from SemiAnalysis directly.

Confidence: média (±12) — the more signals corroborated and both sides measured, the tighter the band.

This region's CFI: 80/100 (forming)

The Compute Formation Index is the weighted average of 4 signals (0–1 each). Here, with this region's numbers:

Formation — convergence of signal types0.912
Energy — queue + % committed + EIA (LOG)0.926
Momentum — signal acceleration (30d vs 30d)1.0
Corroboration — committed share of the queue0.0